Skip to main navigation Skip to main content Skip to page footer

News

Insights, innovations, and milestones, follow how we continue to push the boundaries of microdispensing technology.

VERMES 2025 “Seifenkiste” races off the front!

| News

The 2025 soapbox competition was a true racing spectacle, and we mean that literally!

With around  25 teams taking part in this high-energy community soap  box competition, VERMES Microdispensing left a serious mark on the  track. With one soap box each for the uphill and downhill races,  designed and built entirely by our talented colleagues. But the  innovation didn’t stop there: the uphill soapbox was fully electric in  accordance with the regulations and was only charged by pedaling our  tandem, which was also powered by our team members within the specified  time frame of just  60 minutes. Sustainability and teamwork in motion!

We are happy to report that we beat our own downhill time from last year  by almost 5 seconds, showing just how far our team (and our vehicle!)  has been optimized. 
 And uphill challenge? An incredible  12 seconds for the approx.  250-meter climb - a new best time that had the crowd cheering.

What remains is a day characterized by adrenaline, sunshine and team spirit. A huge thank you to everyone who participated, supported, and  celebrated with us. We are already looking forward to next year’s race!



Back
Zamma race 2025